This Contest 55 in Lymington was undergoing a major refurbishment project when as a Marine Surveyor I was asked to supervise the project. The critical moisture level below the waterline was accurately established using the latest testing equipment, reading both the laminate and the internal end grain balsa core, prior to a full epoxy treatment with WEST system 105.